Treat a zombie as dead, and test fairness where it is deterministic
CI / test (push) Successful in 52s
CI went red on Linux with two failures that never appear on macOS. Both were worth the trip. The first is a real bug. processAlive used kill(pid, 0), which succeeds on a zombie — a process that has exited and is only waiting to be reaped. That happens for real whenever an engine's parent dies before it does and nothing reaps the orphan, which in a container is the normal case: PID 1 is usually the workload rather than an init. The supervisor would then report a dead adopted engine as running forever, and hold its GPUs against every future placement. Zombies are now detected through procfs on Linux, where the answer exists, and the check degrades to its old behaviour elsewhere rather than to something worse. The second was a bad test. TestTenantFairnessWithinBand asserted on the order goroutines sent to a channel after being admitted, which is the order the Go scheduler woke them, not the order the dispatcher chose. Under load it measured the runtime. The rotation itself lives in bandQueue.pop, which is pure, so it is tested there — including what happens when a tenant runs out mid-rotation and when a cancelled waiter is removed. The controller-level test now asserts the thing that is actually stable: nobody is starved. Verified with three consecutive `go test -race ./...` runs in a Linux container. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com> |
||
|
|
1d1a6aebb0 |
Phase 4: make a multi-node replica able to start
CI / test (push) Failing after 53s
Placement and environment generation had landed early, which made multi-node look further along than it was. A replica spanning nodes could not come up at all, and all three reasons came down to assumptions that only hold on one node. Not every rank serves HTTP. The agent health-checked every shard at its own port, but only the leader answers; workers timed out, reported Failed and took the replica with them. Engine.ServesHTTP now says which ranks serve, and a worker is judged by staying alive. That is deliberately weaker evidence: the replica's real readiness is the leader answering, which only happens once every worker has joined. A shard is not always one process. Engine.Commands returns a sequence — every command but the last is a sidecar kept alive for the shard's lifetime and torn down with it, and the last one's exit is the shard's. vLLM under Ray is why: the leader runs a Ray head and then the server against it, while a worker runs only the join and no vLLM process at all. RayCommand had been written and tested but never called, so launch_mode: ray would have run vllm serve against a cluster that did not exist. Sidecars are killed with the shard, because a Ray head left behind holds the port the next replica needs. Start order was backwards. Workers went first, on the theory that the head should wait for them. Both engines put the rendezvous point on rank 0, so a worker started first has nothing to connect to. vLLM's server blocks until the Ray cluster has the GPUs it needs, so the leader can start immediately and waits on its own. A command can now also require that rendezvous point to be listening before the next starts, bounded by a timeout so a head that never appears fails the shard instead of hanging it. Stop was also killing only the engine, leaving sidecars behind. None of this is verified against real engines — it is tested with stub processes. The Ray sequencing, and which launch mode a given vLLM version wants, can only be confirmed on hardware. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com> |
||
|
|
75a8e76706 |
Survive a control plane restart without orphaning live engines
CI / test (push) Successful in 1m44s
Not persisting replica state left one hole: restarting the control plane made it forget every replica while the engines kept running. They held GPUs the inventory believed were free, so the next placement failed to allocate, with an error naming the new process rather than the old one. The fix belongs on the agent, not in a database. A row can say "running" about a process that died; the fleet cannot. - the supervisor writes the full shard spec, not just a pid and command line. A pid identifies a process; the spec is what lets it be described back to the control plane and matched to a replica. - Adopt takes over an engine a previous agent left running. It is not this process's child, so it cannot be waited on: it is watched by polling and stopped by signalling its group directly. Its earlier output is gone and the log says so rather than presenting emptiness as silence. - every Register reports what the agent is running, not only the first, because a reconnect may be a control plane restart and has to recover the same way. - the reconciler rebuilds replicas from those reports and reclaims their GPUs. Anything whose model or profile left the catalog is stopped; nothing will route to it and it is holding cards. - an engine the agent cannot identify is killed. A process holding GPUs that nothing can describe is worse than no process, because placement hands those GPUs out again. Stop was also wrong for adopted shards: it checked for an exec.Cmd, which they do not have, and reported them stopped without killing anything. TestAgentReconnects had been passing for no reason. httptest's CloseClientConnections does nothing to an h2c stream — prior-knowledge h2c hijacks the connection and httptest stops tracking hijacked ones — so the agent never reconnected, and the assertion on the connection map passed on a stale entry. Tests now sever connections through their own listener and count opened streams. Plan §11 also records what multi-node still needs, since placement landing early makes it look further along than it is: workers never become Ready because the agent health-checks every shard while only rank 0 serves HTTP; RayCommand is written and tested but never called; and startup is fire-and-forget. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com> |
||
|
|
6a13e3dddf |
Phase 2 (1/2): node discovery, engine adapters, process supervisor
CI / test (push) Successful in 45s
Everything here works without GPUs and is covered by tests. The control plane connection is not built yet, so llmgw agent itself is still a stub and the phase exit criterion is not met. - discovery: IB from /sys/class/infiniband, parsing the formats sysfs actually uses and telling native InfiniBand from RoCE; GPUs via nvidia-smi, the cgo-free path, with health flags for uncorrected ECC and memory already held by another process. A node without IB is not an error, it is a single-node island. - engines: vLLM and SGLang command and environment construction, kept free of process handling so it stays testable. The NCCL environment is the part the plan marks critical: NCCL_IB_HCA lists only the chosen fabric's adapters, because leaving it open lets NCCL pick an adapter on a fabric where the peer is unreachable, and the job then hangs instead of failing. - validation before launch: no mixed GPU types in a tensor-parallel group, the node/GPU/TP arithmetic has to add up, and fp8 is refused below compute capability 8.9 rather than silently falling back to a slower path. - supervisor: process groups, because engines fork workers that hold GPU memory and outlive a signal sent only to the leader; a bounded log tail, since engine output is the only diagnosis when loading fails; Starting separate from Loading, because a 70B model legitimately takes minutes; and orphan adoption through pid files fingerprinted with the command line, since pids get reused and adopting an unrelated process is worse than leaking the original. - readiness is two questions: /health says the process is up, /v1/models says the weights loaded. Routing on /health alone sends traffic into a loading model. - llmgw agent inventory reports what the scheduler would see on a node. One plan correction: GPU class sizes come from the driver in GiB, which does not always match the marketing name. An L40S is sold as 48GB and reports 44.99 GiB, so its class is l40s-45g, not l40s-48g. Consistency matters more than matching the box, because that number decides whether a model fits. Plan §2 and §5.1 updated. Co-Authored-By: Claude Opus 5 (1M context) <noreply@anthropic.com> |