A design document for step 5 of resource allocation, deferred: location
labels and rack spreading, power budgets with estimated then measured draw,
thermal and cooling conditions with hysteresis, opt-in shedding through
preemption, pluggable facility sources, and a rollout that is useful at
each step and safe when data is missing.
Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>