Files
llmgw/docs
Ilker ManapandClaude Opus 5.5 8724dc027a Plan facility-aware placement: rack power, temperature and cooling
A design document for step 5 of resource allocation, deferred: location
labels and rack spreading, power budgets with estimated then measured draw,
thermal and cooling conditions with hysteresis, opt-in shedding through
preemption, pluggable facility sources, and a rollout that is useful at
each step and safe when data is missing.

Co-Authored-By: Claude Opus 5.5 (1M context) <noreply@anthropic.com>
2026-09-30 19:25:31 +02:00
..